SAP PP Online Training Course
● Overview of ERP● About SAP
● SAP Hierarchy Structure
Master Data
● Material Master● Bill of Material – BOM
● Work Center
● Routing – Different types of Routing
● Production Version
● About ECM – Engineering change Management
Sales and Operational Planning – SOP
● Standard Planning (with standard so76 info structure)● Planning with the Product Groups
● Planning with the Materials
● Product Group Aggregation and Desegregation
● Creation of Plan and version management
● Transfer of Plan to Demand Management
Master Planning
● Demand Planning● Creation of PIR (Planned independent requirements)
● Planning Strategies
Planning Material Requirement
● Master Data requirements in MRP● Carrying MRP Procedure MRP, MPS, CBP
● Difference between MRP Vs MPS
● Control indicators Processing like NETCH, NETPL, NEUPL
● Evaluation of planning results and planning table
● Master Production Scheduling planning run (MPS RUN)
● MRP Run In Background for all network Plants
● Processing Planned orders
● Planned orders conversion
● Production Orders from planned orders
● Production order creation
● Production order confirmation
Goods Movement in PP
● Goods Receipt wref to Production Order● Goods Receipt w/o Production Order
● Goods Issue wref to Production Order
● Creation of GI wref to Reservation
● Restricting Goods Receipt Unless Production Order is Confirmed
Batch Management
● Condition Tables● Access Sequence
● Strategy Types
● PP Batch Search Procedure
● Batch Status in PP
● Characteristics and class
● SLED In Batch in PP
● Manual And Automatic Batch Display In PP
● Production orders creation using Batch
Variant Configuration in PP
● Variant Configuration in BOM● Characteristics
● Class
● Classification
● Classification settings in material master
● Maintain Dependency
● Configurable Profile for Material
Availability Check
Availability Check with ATP Logic or Against Planning
Repetitive and Discrete Manufacturing Process
● Master Data Maintenance● Production versions
● REM Profile
● Backflusing
● REM Backflusing
● MTO and MTS Process
INTEGRATION OF PP WITH OTHER MODULES
● MM● FI
● SD
● QM
● WM
● CO